➀ The plant requires an area of 6000-8000 square meters, with a standard steel structure, a height of no less than 8 meters, and preferably a steel floor and epoxy resin flooring. ➁ The plant should include a material/component warehouse, which can be in the form of shelves and fences. ➂ The plant must be fully compliant and suitable for long-term stable use. ➃ The plant is divided into two spans, each with a 10-ton overhead crane. ➄ Deionized water production equipment is required, and liquid cooling equipment must not use tap water for debugging. ➅ Standard industrial three-phase electricity is needed, with a single machine position requiring a 125A or higher distribution box and corresponding cables, and a total of four test positions. ➆ Large ceiling fans are needed within the site to ensure a good working environment for workers in summer. ➇ Regular industrial compressed gas must be provided. ➈ The surrounding area should have a range of outsourced resources such as argon arc welding, pickling and passivation, sheet metal spraying, wire harness making, and complete machine wiring.
Related Articles
- Automatic Humidifier For The Textile Industry Using Arduino2 months ago
- Virtual PLCs Explained – Working, Comparison, Advantage, Limitations2 months ago
- High-Speed Multi-Camera AOI2 months ago
- USB Cameras With Enhanced Speed And Performance3 months ago
- Vishay Intertechnology AC03-CS Series Axial Cemented, Leaded Wirewound Safety Resistors Now Available With WSZ Lead Form3 months ago
- Encoder For Big Shafts3 months ago
- UV Curable Hot Melt Adhesives3 months ago
- High-Precision Digital Multimeters For Testing3 months ago
- Industry First Standalone AI MCUs3 months ago
- Compact 10W DC/DC Converters3 months ago