<p>➀ Tesla has delayed its Optimus humanoid robot project, halting supplier orders for two months to address design flaws and explore new suppliers;</p><p>➁ Key technical challenges include limited battery life, overheating joint motors, low hand load capacity, and short transmission lifespan, potentially requiring reduced hand movement complexity;</p><p>➂ Leadership changes and scaled-back production targets (originally 5k units in 2025, 50k in 2026) cast doubt on project timelines.</p>
Related Articles
- Mercedes-Benz unveils solar panel paint job on steer-by-wire vehicle8 days ago
 - Softbank, MS reported to be in talks with Wayve to raise $2bn21 days ago
 - Trump strikes back at China with a 100% tariff and critical software ban — major escalation retaliates for China's rare earth restrictions23 days ago
 - The 28th State28 days ago
 - Analog Bits Steps into the Spotlight at TSMC OIPabout 1 month ago
 - Nvidia and Wayve talking about a $500m investmentabout 1 month ago
 - ROBDEKON Competence Center Stabilized Through Association Foundingabout 2 months ago
 - Chip market to hit $800bn this yearabout 2 months ago
 - $1.5trn spend on fab 2024-30, forecasts PwCabout 2 months ago
 - Driver and In-Cabin Monitoring Redefined: Limitless Recognition, Real Benefitsabout 2 months ago